How To Make A Work Breakdown Structure Document

A work breakdown structure (WBS) is a tool we use that is used to decompose a project into smaller, more manageable chunks of work. It is a hierarchical representation of the tasks and subtasks that need to be completed in order to achieve the project’s objectives. Creating a WBS can help project managers to define and organize the work required for a project, as well as to estimate the time and resources needed to complete the work.

To create a WBS document, follow these steps:

  1. Define the project scope: Start by defining the project scope and objectives, as well as any constraints or assumptions that will impact the project. This will help you to identify the work that needs to be done and the outcomes that need to be achieved.
  2. Break the work down into smaller chunks: Next, break the project down into smaller, more manageable chunks of work. These chunks should be specific and measurable, and they should align with the project’s objectives.
  3. Organize the work into a hierarchical structure: Organize the work into a hierarchical structure, with the highest-level tasks at the top and the lowest-level tasks at the bottom. This will help you to see the relationship between different tasks and to identify dependencies between them.
  4. Assign responsibility for each task: Assign responsibility for each task to a specific team member or group. This will help to ensure that everyone knows what is expected of them and that the work is being completed as planned.
  5. Review and refine the WBS as needed: Review the WBS periodically to ensure that it accurately reflects the current state of the project. Make any necessary updates or adjustments as the project progresses.

Overall, creating a WBS document can help project managers to effectively plan and manage the work required for a project, and to ensure that the project is completed on time and within budget.